Construction of Sydney Harbour Bridge: Asphalt and concrete

Title:
Construction of Sydney Harbour Bridge: Asphalt and concrete
NFSA ID
5214
Year
1931
Access fees

Workmen shovel hot asphalt onto a concrete bed to begin laying the roadway for the bridge. The asphalt is smoothed and compressed, rolled and pummelled. Two men walk along the main arch decking and troughing. The 57-foot wide roadway is concreted. Sleepers are prepared for the railway tracks. The footway at the side of the bridge is shown prior to concreting. Summary by Poppy De Souza.